• Twitter
  • Facebook
  • Instagram
  • Youtube
  • English English English en
  • Español Español Spanish es
ESPAÑOL
Fundación Oso Pardo
  • Home
  • WHO WE ARE
    • Management body
    • Our team
    • Our objectives
    • Results that leave a footprint
    • Legal regime
    • We are transparent
  • LEARNING ABOUT THE BROWN BEAR
    • The number of bears and where they live
    • Brown bear details
    • Not all brown bears are brown!
    • Tracks and signs
    • Bear landscapes
    • The repentant carnivore
    • Reproduction and family life
    • Hibernation
    • Bears and climate change
    • Encounters with bears
  • PROJECTS
    • LIFE Projects
      • Proyecto LIFE Human Bear Coex
      • Project LIFE bears with future
      • Other LIFE Projects
    • URSUS Program
    • HABITAT Program
    • Bear houses
    • FOOTPRINT Program
    • Bioeconomy: Chestnuts, Bears, and Rural Development
  • COLLABORATE WITH US
    • Donations and legacies
    • Become “Bears friend”
  • Publications
  • Supports
  • Search
  • Menu Menu

Actualidad

The project’s first planting campaign commences in the Alto Sil in León. December 2022

15 December, 2022

The project’s first planting campaign commences in the Alto Sil in León. December 2022

15 December, 2022/in Actualidad, LIFE Bears with future /by EditorFOP

The first campaign of trophic enrichment plantations for the brown bear was started on 12 December 2022 in the Alto Sil area of León, within the LIFE Osos con futuro project framework and which by the end will comprise the planting of 150 thousand fruit trees and 25 thousand sweet chestnut trees occupying a total of 200 hectares spread across different parts of Castilla y León and Asturias.

The plantations are being made in the public utility lands belonging to the Anllares del Sil local council, in the municipality of Páramo del Sil and of the public mountains of Palacios del Sil. Planting will also be undertaken in land belonging to the Anllarinos del Sil local council, other areas of Páramo del Sil, as well as in private estates of both municipalities. A land custody agreement guaranteeing the long-term presence of these plantations is signed with each landowner prior to work commencing. Planting will also be undertaken in those farmlands acquired with LIFE funds.

Selection of the areas for planting was first undertaken by the project via suitability studies based on plant species and land characteristics in relation to climate change.

Fruit plantation in Páramo del Sil, with local workers hired under the LIFE project. In the center, Elías Suárez, from the FOP.

Local teams started preparing the ground in October 2022 for the hole digging and scrub clearance using a walking excavator, a machine which is able to reach difficult-to-access areas and work on steep slopes, but which produces a minimum impact on the terrain and the existing vegetation. This mechanised labour guarantees the clearance of large amounts of soil for each hole, greatly facilitating the rootstock development of the plants.

The tree and shrub species being planted, the fruits of which serve as food for the brown bear from the end of spring through to the start of winter, are cherry, apple, alder buckthorn, rowan and whitebeams, while chestnut planting will also start very shortly. Collection programs of native wild seeds for the nursery production of seedlings have been undertaken since the start of the project. Two forestry teams, each comprising three men and three women from the immediate area, have been contracted, contributing to local job creation. A total of close to 70,000 fruiting trees and shrubs are planned to be planted during this first plantation campaign, which will be completed between the end of March and start of April, depending on meteorological conditions.

A coordinated project

The “Bears with Future” Project, co-financed by the European Union LIFE Project, will be carried out until 2025. It is coordinated by the Brown Bear Foundation in partnership with the Biodiversity Foundation (Ministry for Ecological Transition and Demographic Challenge), and the Natural heritage Foundation of the Castilla y León regional government. The Government of Asturias is co-financer, via the Directorate General for the Environment and Rural Planning, of the Department of Rural Development, Agriculture and Fisheries. Tierra Pura Foundation collaborates technically and co-finances the project.

Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail
https://m.fundacionosopardo.org/wp-content/uploads/2023/02/plantaciones-paramo-del-sil-frutales-fop-baja.jpg 750 1000 EditorFOP https://m.fundacionosopardo.org/wp-content/uploads/2019/01/Fundacion_Oso_Logo_1.png EditorFOP2022-12-15 11:29:422023-03-03 09:02:42The project’s first planting campaign commences in the Alto Sil in León. December 2022

Pages

  • BEAR HOUSES
  • Become “Bears friend”
  • Bioeconomy: Chestnuts, Bears, and Rural Development
  • COEX
  • Cookies policy
  • Donations and legacies
  • FOOTPRINT Program
  • Form: become bears friend
  • HABITAT Program
  • Home
  • Legal Notice
  • LIFE Projects
  • Management body
  • Marco legal
  • Other LIFE Projects
  • Our objectives
  • Our team
  • Privacy Policy
  • Project LIFE bears with future
  • Proyecto LIFE Human Bear Coex
  • Publications
  • Results that leave a footprint
  • Supports
  • Under review
  • URSUS Program
  • URSUS Program
  • We are transparent

Categories

  • Actualidad
  • LIFE Bears with future
  • LIFE Human Bear Coex
  • Private fundations
  • Public administrations and other public entities
  • Socially Responsible Companies
  • Uncategorized

Archive

  • June 2026
  • June 2025
  • June 2024
  • April 2024
  • March 2024
  • December 2023
  • October 2023
  • September 2023
  • July 2023
  • May 2023
  • April 2023
  • February 2023
  • December 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • March 2022
  • February 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • June 2021
  • March 2021

FUNDACIÓN OSO PARDO

c/ San Luis 17 4ºA.
39010 Santander – Cantabria
(España)

Tel: +34 942 23 49 00
Fax: +34 942 23 50 48
fop@fundacionosopardo.org

© 2024 FUNDACIÓN OSO PARDO

PRIVACY POLICY
COOKIES POLICY
LEGAL NOTICE

Experiences exchange meeting in the French Pyrenees. October 2022Signing of collaboration agreements with the mountain sports federations of...
Scroll to top

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.